Use our weight calculators to find a dumpster with the right volume and weight capacity for your specific type of debris, including: Concrete ; Asphalt ; Roofing Shingles; Drywall; Plaster; Carpet; Why Your Dumpster’s Weight Limit Matters. 03-15-2013, 08:45 PM

Weight of Common Demolition Debris per Cubic Yard. (d) Monitoring. Besides the size of the project, the types and weights of material you are working with will determine how much debris … The Construction and Demolition (C&D) Waste Stream Composition Calculator is an analysis tool that jurisdictions can use to evaluate the material composition of the disposed C&D waste stream. Last edited by Morecoffee; 03-16-2013 at 07:52 AM . I heartily agree with the above answer, but a better and more to the point answer would be: Depends on how heavy it is, and that depends on what the definition of is, is. Estimating 2003 Building-Related C&D Materials Amounts; 1998 Characterization of Building-Related C&D Debris in the United States; Top of Page.

… Look closely at the areas impacted by the hurricane before projecting the mix.


One ton of construction and demolition (C&D) debris equals approximately 2 cubic yards. A good average for woody debris and 70% construction and demolition debris. The data below are from 1960 to 2017, relating to the total number of tons of construction and demolition debris generated. Permittee/contractors must use the C&D Reuse and Recycling Plan to document the following: • Volume or weight of each type of recycled material and where the materials are processed • Volume or weight … Debris Calculators Estimate the Weight and Cost of Your Project Whether you are working on a small residential repair or a major structure demolition, no two jobs are alike.

Once you have your debris estimate, it’s much easier and more accurate to determine your roll-off dumpster needs. 19.07.010 Findings. AND DEMOLITION DEBRIS RECYCLING I Page 6 of 16 (c) During Activities: 1. In estimating the volume or weight of materials the applicant shall use the standardized conversion rates approved by the county for this purpose. Summary Table and Graph . At 4000 lbs per cubic yard tight it worked out to 17.48 by volume and 18 by weight. For mixed debris, FEMA has a brochure called ‘Debris Estimating Field Guide’ from September 2010 that details volume/weight estimations. For the biggest jobs (e.g., industrial buildings), the use of a 50 cubic yard or larger dumpster/trailer may be a viable option. Vegetative Debris Hardwoods: 1 ton = 4 cubic yards Softwoods: 1 ton = 6 cubic yards After Hurricane Fran in North Carolina, the mix was reversed - clean woody debris was 70%. FEMA estimates: Construction & Demolition Debris: 1 ton = 2 cubic yards Mixed Debris: 1 ton = 4 cubic yards. Estimating the weight of your construction and demolition debris is essential to finding the right dumpster for the job. DEMOLITION DEBRIS & WASTE SOURCE VOLUME CALCULATIONS Sunchief Mill Site Tonto National Forest Gila County, Arizona Prepared for: USDA Forest Service 333 Broadway SE Albuquerque, New Mexico 87102 Prepared by: Weston Solutions, Inc. 960 West Elliot Road, Suite 101 Tempe, Arizona 85284 (480) 477-4900 Prepared by: Brendon Loucks, E.I.T.
Calculating Volume and Weight of Debris. Re: How much does a house weigh? in the U.S. increased by approximately 50%, from an estimated $620 … Chapter 19.07 RECYCLING AND REUSE REQUIREMENTS FOR CONSTRUCTION AND DEMOLITION DEBRIS. FEMA DEBRIS ESTIMATING FIELD GUIDE 1 T he Robert T. Stafford Disaster Relief and Emergency Assistance … In the US, several national estimates have been conducted using a weight-per-construction-area approximation; national estimates using alternative procedures such as those used for other segments of the solid waste stream have not been reported for C&D debris. If you’re on the fence, go with the bigger size (40 yard container). Estimating 2003 Building-Related Construction and Demolition Materials Amounts etc.) Date: February 22, 2012 Checked By: … Material: Lbs/Cubic yd: Notes: Burned debris/ash: 800 - 1,000 1,500 - 1,800 2,300: Loose/dry Wet for dust suppression Wet mixed with soil: Asphalt or concrete: 2,400 Wood, un-compacted: 400: Increase up to 100% if compacted using heavy machinery: Metals, un-compacted: 600: Ex. More often than not, you’ll save money by avoiding overage fees. FEMA DEBRIS ESTIMATING FIELD GUIDE CONTENTS Introduction 1 Debris Estimating Considerations 4 Debris Estimating Methods 5 Ground Measurements 6 Buildings and Residences 9 Conversion Factors 13 Aerial Estimates 13 Computer Models 15 Safety 17. One type of debris that has a fairly consistent composition is mixed construction and demolition debris. Depends on the house size, hight, weight, contents, and the matereal used in the construction of the house. Be detailed when explaining the project over the phone to ensure an accurate weight estimate. Dumpster rental companies are remarkably good at estimating weight and volume of different types of debris.